Logo

ISO 4917-6:2024

Current Revision

Design of nuclear power plants against seismic events - Part 6: Post-seismic measures

$81.00

$81.00

$137.70


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


This document applies to nuclear power plants with water cooled reactors.

This document does not apply to earthquakes stronger than the design basis earthquake.

This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.


SDO ISO: International Organization for Standardization
Document Number ISO 4917
Publication Date Not Available
Language en - English
Page Count
Revision Level
Supercedes
Committee ISO/TC 85/SC 6
Publish Date Document Id Type View
Not Available ISO 4917-6:2024 Revision