Logo

IEEE C37.121-2020

Current Revision

IEEE Guide for Switchgear - Unit Substation - Requirements

$64.00

$80.00

$129.60


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

Document Preview Not Available...

Revision Standard - Active. The basis for the coordination of equipment in unit substations by assisting in the selection of components is intended as the use of this guide. A variety of designs for unit substations are possible using various combinations of incoming sections, transformer sections, outgoing sections, and transition sections. It is intended that the incoming, outgoing, transformer, and transition sections included in a unit substation meet the basic requirements of applicable industry standards for those sections. This guide covers three-phase unit substations for step-down operation in the range of 112.5 kVA or greater at primary voltages of 601 V through 52 kV.
This guide covers three-phase unit substations for step-down operation in the range of 112.5 kVA or greater at primary voltages of 601 V through 52 kV. This guide does not cover the following installations: a) Substations in which the transformer section is described and defined as "network," "subway," "vault," or "underground" in IEEE Std C57.12.24 [B13] and IEEE Std C57.12.40 [B15]2 b) Substations in which the transformer section is described and defined as "pad-mounted" c) Rectifier-type substations d) Mobile unit substations e) Installations in ships, watercraft, railway rolling stock, aircraft, or automotive vehicles f) Installations for mines g) Installations of railways for generation, transformation, transmission, or distribution of power used exclusively for operation of rolling stock, or for installations used exclusively for signaling and railway communication purposes h) Installations of communication equipment that is under the exclusive control of communication utilities, located outdoors or in building spaces used exclusively for such installations i) Installations under the exclusive control of electric utilities for the purpose of communication, or metering; or for the generation, control, transformation, transmission, and distribution of electric energy located in buildings used exclusively by utilities for such purposes or located outdoors on property owned or leased by the utility or on public highways, streets, roads, etc.; or outdoors by established rights on private property
The guide is intended for use as the basis for the coordination of equipment in unit substations by assisting in the selection of components. A variety of designs for unit substations are possible using various combinations of incoming sections, transformer sections, outgoing sections, and transition sections. It is intended that the incoming, outgoing, transformer, and transition sections included in a unit substation meet the basic requirements of applicable industry standards for those sections. In addition, this guide provides suggested requirements when used as part of a unit substation.

SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number C37.121
Publication Date March 9, 2021
Language en - English
Page Count 40
Revision Level
Supercedes
Committee Switchgear
Publish Date Document Id Type View
March 9, 2021 C37.121-2020 Revision
Feb. 22, 2013 C37.121-2012 Revision
Nov. 30, 1988 C37.121-1989 Revision