Logo

IEEE 590-1977

Current Revision

IEEE Cable Plowing Guide

$113.00


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

Document Preview Not Available...

New IEEE Standard - Inactive-Withdrawn. Methods used to place cable underground vary widely. The choice of method depends on such factors as soil conditions, surface and subsurface obstructions, total footage to be installed, spacing between taps or splices, joint trenching practices between utilities, depth of burial desired or required, size of cable, and tools available. This guide explores the interrelations of these contributing factors suggesting what should be considered, determinations to be made, and the decisions required before selecting the plowing method for the installation of direct buried cable.
This guide is intended to promote improved communication between manufacturers and users in clarifying terminology and identifying user objectives. It attempts to provide the user with a means for determining whether plowing is a feasible method for a specific application, what plow type is best suited for the intended application or types of applications, and those techniques and practices most likely to maximize performance.

SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 590
Publication Date June 23, 1977
Language en - English
Page Count 9
Revision Level
Supercedes
Committee Transmission and Distribution
Publish Date Document Id Type View
June 23, 1977 590-1977 Revision