Logo

IEEE 415-1986

Current Revision

IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations

$55.00


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

Document Preview Not Available...

Revision Standard - Inactive-Withdrawn. Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.
This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.
The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed.

SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 415
Publication Date Dec. 9, 1985
Language en - English
Page Count 16
Revision Level
Supercedes
Committee Nuclear Power Engineering Committee
Publish Date Document Id Type View
Dec. 9, 1985 415-1986 Revision
Dec. 9, 1976 415-1976 Revision