Logo

IEEE 400.3-2006

Historical Revision

IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment

$87.00


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

Document Preview Not Available...

New IEEE Standard - Inactive-Reserved. This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or off-line by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.
This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using PD detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.
This guide describes diagnostic methods capable of detecting and locating partial discharges from defects and damage in installed shielded power cable systems. The results of PD tests are used to assess the condition of cables and accessories.

SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 400.3
Publication Date Feb. 5, 2007
Language en - English
Page Count 44
Revision Level
Supercedes
Committee Insulated Conductors
Publish Date Document Id Type View
May 15, 2023 400.3-2022 Revision
Feb. 5, 2007 400.3-2006 Revision