Logo

IEEE 336-2005

Historical Revision

IEEE Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities

$87.00


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

Document Preview Not Available...

Revision Standard - Superseded. This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing.
This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing.
The purpose of this guide is to identify the activities, instructions, and attributes that may be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear power stations.Changes to this guide are intended to ⎯ Review and consider "lessons learned" from industry (in particular, for post-modification and postmaintenance testing). ⎯ Provide a more comprehensive, organized "user-friendly" format. ⎯ Review and consider any other related user feedback.

SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 336
Publication Date Feb. 23, 2006
Language en - English
Page Count 16
Revision Level
Supercedes
Committee Nuclear Power Engineering Committee
Publish Date Document Id Type View
Oct. 30, 2020 336-2020 Revision
Sept. 30, 2010 336-2010 Revision
Feb. 23, 2006 336-2005 Revision
April 1, 1985 336-1985 Revision
Aug. 31, 1977 336-1977 Revision
Nov. 30, 1970 336-1971 Revision