IEEE Guide for Conducting Corona Tests on Hardware for Overhead Transmission Lines and Substations

$65.00

$81.00

$131.40


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

Document Preview Not Available...

New IEEE Standard - Active. Uniform procedures for the testing of transmission line and station bus hardware in high voltage laboratories are established in this guide. Two tests are described: the first is a visual corona test, the second is a radio interference voltage (RIV) test. This guide does not address the permissible radio interference (RI) limits or specified corona extinction voltages. They are set either by regulation or by agreement between the utility and hardware manufacturer.
This guide establishes uniform procedures for the testing of transmission line and station bus hardware in high voltage laboratories. Two tests are described. The first one is a corona performance test. The second is a radio interference voltage (RIV) test. The first test uses visible techniques to determine the onset of positive corona. The second test is a measurement of the RIV voltage according to ANSI C63.2 or CISPR 16-1-1 and CISPR 18-2:2010. This guide does not address the permissible radio interference (RI) limits or specified corona extinction voltages. They are set either by regulation or by agreement between the end user and hardware manufacturer.
The purpose of this guide is to establish uniform procedures for the testing of transmission line and station bus hardware in high voltage laboratories. A uniform procedure is a prerequisite to assure such hardware is either free from visible corona or does not add any appreciable RI to that already being generated by the transmission line or substation conductors.

SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 1829
Publication Date March 31, 2017
Language en - English
Page Count 32
Revision Level
Supercedes
Committee Transmission and Distribution
Publish Date Document Id Type View