Logo

ASTM F2019-00

Historical Revision

Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic Cured-in-Place (GRP-CIPP) Using the UV-Light Curing Method

$83.00

$83.00

$149.40


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


...

1.1 This practice covers the procedures for the reconstruction of pipelines and conduits (4 to 48 in. (100 to 1200 mm) diameter) by the pulled-in place installation of a resin-impregnated, flexible fabric tube into an existing conduit followed by inflation with compressed air (see ). The resin/fabric tube is cured by flow through the fabric tube of mixed air and steam. When cured, the finished cured-in-place pipe will be continuous and tight fitting. This reconstruction process can be used in a variety of gravity flow applications such as sanitary sewers, storm sewers, process piping, electrical conduits and ventilation systems.

1.2 The values stated in inch-pound units are to be regarded as the standard. The values given in parentheses are for informational purposes only.

This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.


SDO ASTM: ASTM International
Document Number F2019
Publication Date May 10, 2000
Language en - English
Page Count 6
Revision Level 00
Supercedes
Committee F17.67
Publish Date Document Id Type View
Nov. 15, 2022 F2019-22 Revision
Jan. 1, 2020 F2019-20 Revision
Sept. 1, 2011 F2019-11 Revision
Sept. 10, 2003 F2019-03 Revision
May 10, 2000 F2019-00 Revision
Aug. 1, 2009 F2019-03R09 Reaffirmation