Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

...

1.1 This practice describes the procedures for the rehabilitation of sewer lines and conduits for existing pipelines 6 to 180 in. in diameter by the insertion of a machine-made field-fabricated spiral wound liner pipe into the existing pipeline using a winding machine which remains stationary in the insertion pit or, alternatively, which travels along the interior of the existing pipeline. These rehabilitation processes can be used in a variety of gravity applications such as sanitary sewers, storm sewers, culverts, and process piping.

1.1.1 When using stationary installation equipment for existing pipelines 6 to 48 in., after insertion, the spiral wound liner pipe is expanded until it presses against the interior surface of the existing pipeline. Alternatively, for existing pipelines 6 to 108 in. in diameter, the spiral wound liner pipe is inserted as a fixed diameter into the existing pipeline and is not expanded, and the annular space between the spiral wound liner pipe and the existing pipe is grouted.

1.1.2 When using the traveling installation equipment for existing pipelines 6 to 180 in. the spiral wound liner pipe is installed in contact with the interior surface of the existing pipeline to form a close fit liner, except in the corners of rectangular pipes or where obstructions or offsets occur. Alternatively, for existing pipelines 6 to 180 in. in diameter and for similar sized existing non circular pipelines such as arched or oval or rectangular shapes, the spiral wound liner is installed as a fixed diameter into the exiting pipeline to form a non-close fit liner and the annular space between the spiral wound liner pipe and the existing pipe is grouted.

1.2 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.

1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

1.3.1 Particular attention is drawn to those safety regulations and requirements involving entering into and working in confined spaces.


4.1 This practice is for use by designers and specifiers, regulatory agencies, owners, and inspection organizations who are involved in the rehabilitation of non-pressure sewers and conduits. Modifications may be required for specific job conditions.

SDO ASTM: ASTM International
Document Number F1741
Publication Date May 1, 2016
Language en - English
Page Count 9
Revision Level 08(2016)
Supercedes
Committee F17.67
Publish Date Document Id Type View
Nov. 15, 2022 F1741-22 Revision
April 1, 2018 F1741-18 Revision
Nov. 1, 2008 F1741-08 Revision
June 1, 2007 F1741-07 Revision
Aug. 15, 2005 F1741-05 Revision
Sept. 10, 2002 F1741-02AE01 Revision
Sept. 10, 2002 F1741-02A Revision
Jan. 10, 2002 F1741-96 Revision
Jan. 10, 2002 F1741-02 Revision
Jan. 10, 2002 F1741-01E01 Revision
Jan. 10, 2002 F1741-01 Revision
May 1, 2016 F1741-08R16 Reaffirmation