Logo

ASTM D5903-96(2001)

Historical Reaffirmation

Standard Guide for Planning and Preparing for a Groundwater Sampling Event

$73.00

$73.00

$131.40


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


...

1.1 This guide covers planning and preparing for a ground-water sampling event. It includes technical and administrative considerations and procedures. Example checklists are also provided as Appendices.

1.2 This guide may not cover every consideration procedure, or both, that is necessary before all ground-water sampling projects. In karst or fractured rock terranes, it may be appropriate to collect ground water samples from springs (see Guide D 5717). This guide focuses on sampling of ground water from monitoring wells; however, most of the guidance herein can apply to the sampling of springs as well.

1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

1.4 This guide offers an organized collection of information or a series of options and does not recommend a specific course of action. This document cannot replace education or experience and should be used in conjunction with professional judgment. Not all aspects of this guide may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project's many unique aspects. The word "Standard" in the title of this document means only that the document has been approved through the ASTM consensus process.


SDO ASTM: ASTM International
Document Number D5903
Publication Date March 10, 1996
Language en - English
Page Count 4
Revision Level 96(2001)
Supercedes
Committee D18.21
Publish Date Document Id Type View
June 1, 2017 D5903-96R17E01 Revision
March 10, 1996 D5903-96E01 Revision
Feb. 1, 2023 D5903-96R23 Reaffirmation
July 1, 2012 D5903-96R12 Reaffirmation
July 1, 2006 D5903-96R06 Reaffirmation
March 10, 1996 D5903-96R01 Reaffirmation