Logo

ASTM C1188-91(1997)e1

Historical Revision

Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities (Withdrawn 2017)

$83.00

$83.00

$149.40


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


...

1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities.

1.2 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use. 

1.3 The basic elements of a quality assurance program appear in the following order:

FUNCTION SECTION Organization 5 Quality Assurance Program 6 Design Control 7 Instructions, Procedures ∧ Drawings 8 Document Control 9 Procurement 10 Identification and Traceability 11 Processes 12 Inspection 13 Control of Measuring and Test Equipment 14 Handling, Storage and Shipping 15 Inspection, Test and Operating Status 16 Control of Nonconforming Items 17 Corrective Actions 18 Quality Assurance Records 19 Audits 20

SDO ASTM: ASTM International
Document Number C1188
Publication Date Dec. 10, 1997
Language en - English
Page Count 8
Revision Level 91(1997)e1
Supercedes
Committee C26.08
Publish Date Document Id Type View
June 1, 2011 C1188-04R11 Revision
June 1, 2004 C1188-04 Revision
Dec. 10, 1997 C1188-91R97E01 Revision