Stay effortlessly up-to-date with the latest standard revisions. When new versions are released, they're automatically charged and delivered to you, ensuring seamless compliance.

...

1.1 This practice covers procedures, soils, and soil placement for the proper installation of corrugated steel pipe and pipe-arches produced to Specification A760/A760M or A762/A762M, in either trench or embankment installations. A typical trench installation and a typical embankment (projection) installation are shown in Figs. 1 and 2, respectively. The pipes described in this practice are manufactured in a factory and furnished to the job in lengths ordinarily from 10 to 30 ft [3 to 9 m], with 20 ft [6 m] being common, for field joining. This practice applies to structures designed in accordance with Practice A796/A796M.

Typical Trench Installation
FIG. 1 Typical Trench Installation
Typical Embankment (Projection) Installation
FIG. 2 Typical Embankment (Projection) Installation

1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

1.3 This specification is applicable to design in inch-pound units as A798 or in SI units as A798M. Inch-pound units and SI units are not necessarily equivalent. SI units are shown in brackets in the text for clarity, but they are the applicable values when the installation is to be performed in accordance with A798M.


This specification covers procedures, soils, and soil placement for the proper installation of corrugated steel pipe and pipe-arches for sewers and other applications. The supporting soil beneath the pipe must provide a reasonably uniform resistance to the imposed load, both longitudinally and laterally. All pipes shall be unloaded and handled with reasonable care. Material used for bedding beneath the pipe shall meet the requirements specified. Pipe shall not be rolled or dragged over gravel or rock and shall be prevented from striking rock or other hard objects during placement on bedding.


SDO ASTM: ASTM International
Document Number A798
Publication Date May 1, 2013
Language en - English
Page Count 6
Revision Level 13
Supercedes
Committee A05.17
Publish Date Document Id Type View
June 1, 2022 A0798_A0798M-22 Revision
Dec. 1, 2017 A0798_A0798M-17 Revision
May 1, 2013 A0798_A0798M-13 Revision
Sept. 15, 2007 A0798_A0798M-07 Revision
April 10, 2001 A0798_A0798M-97A Revision
April 10, 2001 A0798_A0798M-01 Revision