Logo

ACI 364.8-22

Current Revision

Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems—TechNote:

$19.00

$19.00

$26.60


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


...

Should hydrodemolition be used to remove concrete in structural elements with unbonded post-tensioned systems? Keywords: anchorage; concrete removal; corrosion; demolition; high-pressure water jetting; hydrodemolition; microcracking; post-tensioning; repair; sheathing.

SDO ACI: American Concrete Institute
Document Number 364.8
Publication Date Jan. 1, 2022
Language en - English
Page Count
Revision Level
Supercedes
Committee
Publish Date Document Id Type View
Jan. 1, 2022 ACI 364.8-22 Revision