This report covers design and construction of 30 in. (760 mm) diameter or larger foundation piers constructed by excavation of a hole in a subgrade that is later filled with concrete. The 30 in.(760 mm) diameter boundary is an arbitrary size; smaller-diameter drilled piers can be designed and installed in accordance with ACI 543R. Although determination of overall pier size and concrete section design are two basic drilled pier design procedures, emphasis is focused on the determination of overall pier size, which is affected by the interaction between subgrade and pier. Because pier capacity is significantly affected by construction means and methods, the licensed design professional should understand these limitations. Construction methods described include excavation, casing, reinforcing steel installation, and concrete placement.Acceptance criteria and recommended procedures for construction, engineering, and evaluation are presented. Keywords: bearing capacity; caisson; casing; excavation; foundation; geotechnical engineering; lateral pressure; lining; slurry; tremie.

SDO ACI: American Concrete Institute
Document Number 336.3
Publication Date Jan. 1, 2014
Language en - English
Page Count
Revision Level
Supercedes
Committee
Publish Date Document Id Type View
Jan. 1, 2014 ACI 336.3-14 Revision
Jan. 1, 1993 ACI 336.3S-93 Revision